Skip to content

Completed and Ongoing Projects in Oyo State, June 2019 to July 2025

Completed and Ongoing Projects in Oyo State

Below is an updated list of completed and ongoing projects executed during Governor Seyi Makinde’s tenure between June 2019 and July 2025. Most of these projects are listed with pictures under ongoing projects, completed projects, and on the FeedbackOYSG social media pages. Governor Seyi Makinde’s campaign promises can also be tracked through his Oyo State Roadmap for Accelerated Development 2019-2023 here and Oyo State Roadmap for Sustainable Development 2023-2027 here.

Completed and Ongoing Projects in Education

  1. Construction of 60 model schools across Oyo State under the Oyo SUBEB-UBEC intervention programme.
  2. Other Oyo SUBEB Projects: Construction/Renovation/Rehabilitation of blocks of classrooms in the State (between 2019 and 2022)
    1. Construction of 339 classrooms with toilet facilities
    2. Renovation of 443 classrooms
    3. Installation of 90 boreholes
    4. Construction of 76 toilets
    5. Construction of 13 ECD pilot centres
    6. Procurement and distribution of over 26,500 pairs of student furniture
    7. Construction of perimeter fence in 9 schools
  3. Cancellation of all forms of fees and levies in public schools since 29 May 2019.
  4. Increase in enrolment in public schools by over 50% (2020)
  5. Provision of free instructional materials to students (2020)
  6. Distribution of 100,000 copies of the compendium of WAEC and NECO past questions (2020)
  7. Introduction of intervention classes for SS3 and UTME students (2019)
  8. Procurement of teaching and learning aids for 21 public special primary schools and 12 public special secondary schools in Oyo State; Perkins Braille, Manual typewriter, Index everest braille embosser, Duxbury braille translator, Universal braille kit, Talking calculator, Reams typing paper, Walking sticks/mobility cane, JAWS for Windows (single interface), Generator 5kv.

Others were Braille math blocks, Braille alphabet chart, Braille letter keychain, Audio meter, Over head projector, Hearing aids, Joy singing 3rd edition, HP desktop, Educative toys, Charts, Domino cube puzzle, First aid box, Mattress, VCD, Crutches and Regular wheel chair. (executed in 2021)

  1. Recruitment of 5,000 secondary school teachers (completed in 2021).
  2. Recruitment of 692 Education Officers (completed in 2021).
  3. Sole ownership of the Ladoke Akintola University of Technology (LAUTECH – achieved in 2020).
  4. Take-off grant of N500 million for the College of Agricultural Sciences and Renewable Natural Resources, Iseyin (2021).
  5. Increase in subvention to tertiary institutions in the State to 100% (2020).
  6. Conversion of Emmanuel Alayande College of Education to a University of Education (completed in 2023)
  7. Annual bursary award of N500,000 to Law School students who are Oyo State indigenes since 2019.
  8. Annual bursary award to final year students in tertiary education nationwide who are Oyo State indigenes commenced in 2025.
  9. Construction of various buildings at LAUTECH Iseyin Campus (completed)
  10. Take off grant of N1 billion for the Emmanuel Alayande University of Education (December 2024)
  11. Recruitment of 7,000 primary school teachers (5,600 completed and 1,400 ongoing)
  12. Recruitment of 7,500 secondary school teachers (5,240 completed and 2,250 ongoing)
  13. Recruitment of 100 caregivers for special needs schools (completed)
  14. Recruitment of 3,000 non-teaching staff for secondary schools (ongoing)
  15. 28 18-seater buses to Federal, State, Indigenous and Special Education Institutions in Oyo State (handed over 7 March 2024)
  16. Renovation/reconstruction of 3-classroom blocks in 105 schools (315 classrooms in total) in rural areas as part of the GPE/BESDA-AFTESS initiative (completed).
  17. Renovation/reconstruction/construction of classroom blocks in 36 public schools across Oyo State (ongoing).

Completed and Ongoing Projects in Healthcare

  1. Renovation/reconstruction/construction of 209 Primary Healthcare Centres across Oyo State (completed).
  2. Establishment of Neonatal Ward at Adeoyo Maternity Teaching Hospital
  3. Solarised Pressure Swing Adsorption Medical Oxygen Plant and Level 2 Newborn Unit at Jericho Specialist Hospital, Ibadan  (Facilitated by UNICEF, CHAI and NACA).
  4. Renovation and equipping of Public Healthcare facilities:
    1. Upgrade of Ring Road State Hospital, Adeoyo Theatre (completed).
    2. Upgrade of Adeoyo Maternity Teaching Hospital (completed).
    3. Upgrade of LAUTECH Teaching Hospital, Ogbomoso (completed).
    4. Public Health Laboratory, Jericho, Ibadan (completed).
    5. Renovation and upgrade of Staff Clinic, Secretariat, Ibadan (completed).
  5. Establishment of a Geriatric Centre at the former Jericho Specialist Hospital
  6. Upgrade and conversion of health facilities to Isolation Centres during the COVID-19 pandemic:
    1. Infectious Disease Centre, Olodo.
    2. Primary Health Centre, Awe
    3. LAUTECH Teaching Hospital
    4. Agbami Chest Centre
    5. Conversion of Primary Health Centre Igbo-Ora to General Hospital Annexe
  7. Recruitment of five hundred and thirty-three (533) medical staff (completed).
  8. Increase in the enrolment of people in the health insurance scheme from 69,996 in Sept 2019, to 180,048 in Sept 2023 and 255,140 in May 2025
  9. Solar power installation in 23 PHCs.
  10. Distribution of 97 and 120 generators to renovated and upgraded primary health centres (PHCs) as a backup power source (completed)
  11. Equipping 264 PHCs, including the 209 upgraded (completed)
  12. Designation of PHCs as 24-hour and 9-hour Service Delivery Centres (SDCs) to improve access to quality healthcare (ongoing)
  13. Recruitment of 232 doctors, nurses, pharmacists, physiotherapists and medical laboratory scientists and exit replacement of health workers who left the service from 2021 till date (completed)
  14. Secondary healthcare facilities upgrades:
    1. Upgrade of General Hospital, Aremo, Ibadan (completed).
    2. Upgrade of General Hospital, Tede, Atisbo LGA (completed).
    3. Renovation and equipping of Renal Dialysis Centre at Ring Road State Hospital, Adeoyo, Ibadan (completed).
    4. Renovation and equipping of High Dependency Unit (HDU) at Ring Road State Hospital, Adeoyo, Ibadan (completed).
    5. Creation of a High Dependency Unit (HDU) at the LAUTECH Teaching Hospital, Ogbomoso (completed).
  15. Renovation of 106 Primary Healthcare Centres across Oyo State (ongoing).
  16. Quarterly Omituntun Free Health Mission
  17. Free Hydrocele surgeries and Lymphedema management
  18. SAfER Care Scheme (Free health insurance to registered children under 5, pregnant women, the elderly, widows, PLWDs and vulnerable people earning less than N200/day) – (ongoing). 

Completed and Ongoing Projects in Security

  1. Purchase of operational vehicles for security agencies in the State
    1. 100 operational vehicles equipped with communication gadgets to the Nigeria Police Force
    2. 5 operational vehicles to Police Mobile Force Squadron which commenced operations at Ago-Are in Oke-Ogun
    3. 25 operational vehicles to Nigeria Police Force and “Operation Burst”
    4. 33 operational vehicles and 396 motorcycles to Oyo Amotekun
    5. 2 additional operational vehicles to Oyo Amotekun and Oyo Amotekun (along with motorcycles)
    6. 9 operational vehicles to the Security Joint Force is made up of officers of the Nigeria Police Force and the Nigeria Security and Civil Defense Corps (NSCDC)
    7. 100 operational vehicles to Oyo Amotekun
    8. 10 operational vehicles to the Nigeria Police Force
    9. 74 operational vehicles to each division of the Nigeria Police Force
    10. 30 operational vehicles to security agencies
    11. 105 operational vehicles to the Nigeria Police Force, ‘Operation Burst,’ DSS, Correctional Service and Oyo Amotekun, as well as Oyo State Road Traffic Management Authority (OYRTMA)
    12.  50 operational vehicles to various security agencies
    13. 6 armoured personnel carriers to the Nigeria Police Force, Oyo State Command
  2. Establishment of a security post at Mamu Village on the Oyo-Ogun States border
  3. Establishment of Police Mobile Force Squadron 72 at Ago Are
  4. Operationalising of 615 Emergency Security Number
  5. Establishment of Forward Operation Base (FOB) along Kisi-Igboho-Igbeti to provide security coverage for the forests around the Oke Ogun area
  6. Expansion of the State Security Control Room for the City Watch (State CCTV)
  7. Supply and installation of radio communication infrastructure and ancillaries for Oyo State Police and other Paramilitary Organisations
  8. Clearance operations of the forests in the State to ward off criminals in the forest areas
  9. Supported security agencies to carry out an operation flushing illegal miners out in the Oke-Ogun region
  10. Safe School Initiatives
  11. Agro Rangers to maintain peace between farmers and herders in the State
  12. Establishment of Oyo State Security Network Agency (Amotekun Corps), construction of Headquarters in Ibadan and recruitment of 2,000 personnel for the Agency.
  13. Provision of 58 hectares of land and grant of N500 million for the establishment of a Permanent Base of the 671 Nigerian Air Force Detachment at Ajia, Ona-Ara Local Government Area 
  14. Provision of communication gadgets, bulletproof vests, etc., for security operatives
  15. Set up an Emergency Operations Centre in response to the Bodija incident of January 2024
  16. Rebuilt the Police Headquarters in Ojoo
  17. Ensuring the welfare of security agencies, including providing rations to officers
  18. Maintenance and fuelling of operational vehicles

An additional 480 Amotekun Corps members were recruited as a sub unit- Forest Rangers to bring the total number of corps members to about 2,500.

Completed and Ongoing Projects in Economy

  1. Attracted over N46 billion worth of Agribusiness private sector investment to Oyo State (as of 2024)
  2. Construction of Fasola Agribusiness Industrial Hub, Oyo (fully subscribed and nearly completed). The value of investment as of  2024 is about N20 billion.
  3. Revamping of Moribund Facilities:
    1. Pacesetter Quarry and Asphalt Plant, Ijaiye (completed).
    2. Reconstruction of OYSADA Headquarters, Saki (completed).
    3. Upgrade of the Oyo State-IITA Youth Agribusiness Incubation Park Centre, Awe
    4. Agricultural Equipment Training and Fabrication Centre, Apata (PPP) – executed by a private company, Niji Farms
  4. Biometric capture of 30,130 farmers as of June 2025
  5. OYS-CARES Conditional Cash Transfer to 3,510 Vulnerable Persons (Phase 2) (September 2023)
  6. Supporting small businesses with credit and operation grants under the Oyo-CARES programme Result Area 3 executed by the Oyo State Investment Public Private Partnership Agency (OYSIPA) (February 2023)
  7. Distribution of farm inputs to smallholder farmers under the OYS-CARES programme:
    1. Phase 1 (October 2022) distribution covered 10 Farmer Community Associations in Oyo State
    2. Phase 2 distribution (September 2023) covered 15 LGAs in Oyo State
    3. Distribution of high-quality cassava seeds to farmers across the State (August 2024)
    4. Phase 4 distribution (September 2024) covered 26 LGAs in Oyo State 
  8. Installation of Start Them Early Program (STEP) in 13 schools across the State
  9. Training of 3,300 youths under the Youth Entrepreneurship in Agribusiness Project (YEAP)
  10. Empowerment of 100 females in Agribusiness through the SEFAN/SWEAN project
  11. Training of 22,370 farmers on weather predictions, soil management and other agriculture practices.
  12. Statewide free vaccination of 250,000 sheep/goat and 120,000 cattle with Anthrax, CBPP and CR vaccines
  13. Execution of the Sustainable Actions for Economic Recovery (SAfER) package. Components are enumerated below:
  1. Ongoing execution of the Oyo State Livestock Productivity and Resilience Support Project (L-PRES).
  2. Rehabilitation and construction of about 700 km of roads in the State:
Road ProjectsStatus
Construction of 32.2 km (South East Wing) of the 110 km Rashidi Ladoja Circular Road, IbadanOngoing
Construction of 36 km (North East Wing) of the 110 km Rashidi Ladoja Circular Road, IbadanOngoing
Limited Rehabilitation of the 83.83 km Saki-Iseyin Road (a federal road)Ongoing
Construction of 76.7 km Iseyin-Fapote-Ogbomoso Road. The road connects Oke-Ogun and Ogbomoso ZonesCompleted
Reconstruction of 65 km Moniya-Ijaiye-Iseyin Road. The road connects Ibadan and Oke Ogun ZonesCompleted
Reconstruction of 48 km Ido-Eruwa Road. The road connects Ibadan and Ibarapa ZonesOngoing
Rehabilitation of 45.3 km Saki-Ogbooro-Igboho Road. The road connects Saki West, Saki East and Oorelope Local Government AreasOngoing
Reconstruction of 37.41 km Beere-Olorunsogo-Amuloko-Akanran-Dagbolu RoadOngoing
Rehabilitation of the 37.1 km Alako–Idiya–Batake–Olowa–Ijaiye Farm Settlement Road in Ido LGA Begins Under RAAMPOngoing
Reconstruction, rehabilitation and expansion of 35.53 km Ibadan-Iwo-Osogbo RoadOngoing
Reconstruction of 34.85 km Oyo-Iseyin Road. The road connects Oyo and Oke-Ogun Zones. It is also the main artery for accessing the Fasola Agribusiness Industrial Hub, which is almost completedCompleted
Reconstruction of 21 km Airport-Ajia-New Ife Express Road with a spur to AmulokoOngoing
Rehabilitation and total asphaltic overlay of 16.96 km Kolapo Ishola GRA Road networkCompleted
Reconstruction of UI (Preboye Junction)-Bodija Market-Secretariat-Total Garden-Beere Roundabout, Ibadan (15.53 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Ongoing
Dualisation of 12.5 km Challenge-Odo Ona Elewe-Elebu-Apata Road, renamed Theophilus Akinyele WayCompleted
Reconstruction of 12 km Apete-Awotan-Akufo Road into a rigid pavement roadOngoing
Reconstruction of Queen Cinema-Dugbe-Mokola-Sango-Trans Amusement Park Junction, Ibadan (11.74 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Completed
Reconstruction of Bus Stop Gate-Oje-Beere-Oja Oba-Molete Under Bridge Road (10.8 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Completed
Dualisation of 9.7 km Saki Township Road (Saki-Ilesa-Baruba Road)Completed
Reconstruction of Molete Under Bridge-Oke Ado-Oke Bola-Queen Cinema, Dugbe, Ibadan (9.3 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Ongoing
Reconstruction of Mile 110-Ring Road Mobil-Challenge Car Park (8.5 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Completed
Dualisation of 8.2 km Agodi Gate-Old Ife Road-Alakia-Adegbayi Road with an Underpass at OnipepeyeCompleted
Dualisation of 7.25 km Idi Ape-Basorun-Akobo-Odogbo Barracks RoadCompleted
Rehabilitation of Selected Roads within Old and New Bodija, lbadan Metropolis (7.17 km) and the State SecretariatOngoing
Reconstruction of the 6.82 km FRSC (Ago Are Saki Link)-Okudi Oyada (Tede), Atisbo and Saki West LGA, under the Rural Access and Agricultural Marketing Project (RAAMP)Ongoing
Reconstruction of Government House-NTA Junction-Ikolaba JAMB Office-Officers’ Mess-Federal Secretariat, Ibadan (6.13 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Completed
Construction of 5.5 km Adegbayi Junction-Bus Terminal-Iwo Road InterchangeNearly Completed
Reconstruction of 5.48 km General Gas Junction-Kolapo Ishola GRA-Iyana Church with a spur to Dizengoff Junction Road, Iyana Church. This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Completed
Reconstruction of 5.2 km Gedu-Oroki-Sabo-Asipa Road, Oyo ZoneCompleted
Rehabilitation of 4.78 km Akingbile-Lagbeja-Ajibode RoadOngoing
Rehabilitation of the Tewure Market-Ila Junction Road (4.73 km), Oriire LGA, under the Rural Access and Agricultural Marketing Project (RAAMP)Ongoing
Reconstruction of 4.15 km BCJ-Railway-Gbekuba-NIHORT Junction, IbadanOngoing
Expansion of 4 km Beere-Alekuso-Oritamerin-Agbeni-Ogunpa-Lebanon Street-Dugbe RoadCompleted
Reconstruction of Iyaganku-Seventh Day-Oke Bola Junction and Olubadan Stadium Junction-Vale College-NUJ Press Centre Junction with a spur to Total Filling Station-Radio Nigeria-Kobiowu Estate Akinyemi Junction, Ring Road (3.85 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Completed
Reconstruction of the Akala Way-Akobo Junction (3.78 km)Ongoing
Reconstruction of Oke Adu-Ode Aje-Aremo-Orita Aperin Road (3.5 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Ongoing
Reconstruction of Felele Idi Odo Junction–Splash FM Radio Station–Onigari Felele Expressway (3.5 km)Ongoing
Reconstruction of Aare Junction-Ashi Along Bodija Road, Ibadan (3.48 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Completed
Reconstruction of Bodija Ojurin-Ashi Bashorun with a Spur to Ojoo, Ibadan (3.45 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Ongoing
Expansion of 3.26 km Oke Adu Junction-Agodi Gate-Idi Ape Road-Iwo Road InterchangeCompleted
Dualisation of 3.2 km Ibadan Airport Road, rehabilitation of adjoining roads along the airport axis and rehabilitation of spur roads around Iwo Road Interchange including the road from Oludare to Bishop Phillips (2 km)Completed
Reconstruction of internal roads in Olive Estate, Agodi (3.1 km)Ongoing
Reconstruction of 3 km Under G-Stadium-LAUTECH-2nd Gate Road, OgbomosoCompleted
Reconstruction of Oshuntokun-Housing Corporation-Elewure Junction-Awolowo Junction Road, Ibadan (2.99 km). This is one of the 12 roads approved for reconstruction in 2024 under Lots 1 and 2Completed
Reconstruction of Idi Arere- Kudeti – Eleta- Idi Aro- Labo Junction Orita Aperin Road, Ibadan (2.8 km). This is one of the 6 roads approved for reconstruction in 2024 under Lot 3Completed
Reconstruction of Ogbori Efon- Ita Baale- Beyenruka- Ode Aje- Aremo Junction and Benyenruka- Labiran Beere Road, Ibadan (2.52). This is one of the 6 roads approved for reconstruction in 2024 under Lot 3Completed
Reconstruction of Oke Ado-Tribune- Imolefe Alafia- Ososami- Iyana Adeoyo Junction, Ring Road, Ibadan (2.15 km). This is one of the 6 roads approved for reconstruction in 2024 under Lot 3Completed
Reconstruction of Yemetu Mobil Adeoyo Road- Total Filling Station Idi Ayunre Oje- Aremo, Ibadan (1.95 km). This is one of the 6 roads approved for reconstruction in 2024 under Lot 3Completed
Asphaltic Rehabilitation of the 1.70 km Molete Under Bridge-Idi Odo-Challenge RoadOngoing
Reconstruction of Idi Arere- Popo Yemoja Road- Oke Ado Molete Road, Ibadan (1.4 km). This is one of the 6 roads approved for reconstruction in 2024 under Lot 3Completed
Construction/Rehabilitation of the 800m Bishop Court-Bolajoko Road (an addendum to the completed dualisation of the 7.25 km Idi Ape-Basorun-Akobo-Odogbo Barracks Road)Completed
Construction of 65m General Gas FlyoverCompleted
Junction improvement works and traffic management system installation at Challenge and Felele JunctionsCompleted
Junction improvement works at Idi Ape, Civic Centre, and Agodi GateCompleted
Junction improvement work at the University of Ibadan JunctionOngoing
Rehabilitation of Iwo Road Roundabout and Expansion of the Scope of the Ongoing Reconstruction of the Adegbayi Junction-Bus Terminal-Iwo Road InterchangeOngoing
Regular road maintenance across the State by the Oyo State Road Maintenance Agency (OYSROMA):
Rehabilitation of General Gas-Valencia College-Kolapo Ishola GRA Road, Ibadan
Laying of asphalt at Odeloba GAA Masifa-Katongua Road, Ogbomoso North LGA
Several Roads in Ogbomoso South, Surelere, Oyo East and West, Afijio, and Atiba LGAs
Rehabilitation along Jemibewon Road
Road repairs along Sabo Road, Ayefele/Efunsetan Road and Parliament Road
Rehabilitation of roads in Ibadan: ANCE Junction, Adeoyo Junction and Dugbe Road (opposite the post office)
Rehabilitation of roads in 16 Local Government Areas of Oyo State
Completed

Completed and Ongoing Road Infrastructure Projects in Oyo State

  1. Construction of Bus terminals:
    1. Iwo Road (Ongoing)
    2. New Ife Road (Ongoing)
    3. Challenge (completed)
    4. Ojoo (completed)
  2. Construction of Omololu Olunloyo Park, Ibadan ( completed)
  3. Installation of traffic lights at the Omololu Olunloyo Airport Road Junction, Ibadan (completed)

Completed and Ongoing Projects in Other Sectors

  1. Upgrade of the Samuel Ladoke Akintola Airport, Ibadan, to an international airport (ongoing)
  2. Stadium Construction, Renovation, and Upgrade:
    1. Remodelling of Lekan Salami Sports Complex, Adamasingba, Ibadan (Phase 1 completed while Phase 2 is ongoing)
    2. Construction of Mini Stadium Igbo-Ora, Ibarapa (ongoing)
    3. Reconstruction of Olubadan Mini Stadium, Ibadan (nearly completed)
    4. Upgrade of Durbar Stadium, Oyo (ongoing)
    5. Upgrade of Soun Township Stadium, Ogbomoso (ongoing)
    6. Upgrade of Saki Township Stadium (ongoing)
    7. Remodelling of Ebedi Township Stadium, Iseyin (ongoing)
  3. 250 km of Light Up Oyo Project:
    1. The Light Up Oyo Phase I project (completed) covers: Iwo Road to Idi Ape, Ojoo to Barracks, Orita Challenge to New Garage, Sango (Rail track area) to the University of Ibadan to Ojoo, Toll Gate to Interchange to Orita Challenge to Challenge Roundabout
    2. Light Up Oyo Phase 2 (ongoing), including the installation of Gas Generators to serve as a backup power source
  4. Off-grid rural electrification:
    1. Solar hybrid mini-grid at Otefon, Atiba LGA (completed)
    2. Solar hybrid mini-grid at Agbararu, Iwajowa LGA (completed)
    3. Solar hybrid mini-grid at Ajia, Ona Ara LGA (completed)
    4. Solar hybrid mini-grid at Arowomole, Ogbomoso South LGA (completed)
    5. Solar hybrid mini-grid at Orisumibare, Ogbomoso South LGA (60KW Solar System with 1.4 km distribution network)
    6. Solar hybrid mini-grid at Budo-Are (completed – facilitated by the private sector)
    7. Solar hybrid mini-grid at Abuja Leather (completed – facilitated by the private sector)
    8. Solar hybrid mini-grid at Arget (completed – facilitated by the private sector)
    9. Solar hybrid mini-grid at Elekonkan (completed – facilitated by the private sector)
    10. Solar hybrid mini-grid at Ayegun Wasimi (completed – facilitated by the private sector)
    11. Solar hybrid mini-grid at Kofeogun (completed – facilitated by the private sector)
    12.  Solar hybrid mini-grid at Saani Sala (completed – facilitated by the private sector)
    13. Solar hybrid mini-grid at Okerete (completed – facilitated by the private sector)
    14. Solar hybrid mini-grid at Iregba Oja (completed – facilitated by the private sector)
    15. Solar hybrid mini-grid at Adafila (completed – facilitated by the private sector)
    16. Solar hybrid mini-grid at Olokoto (completed – facilitated by the private sector)
    17. Solar hybrid mini-grid at Oko-Ile (completed – facilitated by the private sector)
    18. Solar hybrid mini-grid at Ahoro Dada (completed – facilitated by the private sector)
    19. Solar hybrid mini-grid at Igbori (completed – facilitated by the private sector)
    20. Solar hybrid mini-grid at Oloropo Nla (completed – facilitated by the private sector)
    21. Solar hybrid mini-grid at the Oyo State-IITA Youth in Agribusiness Incubation Park Centre, Aawe (completed)
  5. Development of an Independent Power Project (IPP) for the State Secretariat and environs designed for 10 MW gas and 1 MW solar PV (phase one – 5MW completed)
  6. Construction of Shell Gas Pipeline, Lagos-Ibadan Expressway (ongoing -final investment agreement signed May 2024)
  7. Providing ICT equipment and internet/intranet connectivity at the State Secretariat
  8. Construction of ICT Hub, Mokola (completed)
  9. Construction of Bodija Recreation Centre (ongoing)
  10. Construction of Eleyele Filling Station and shops (completed)
  11. Ibadan Urban Flood Management Projects (IUFMP):
    1. Expansion of river bank at Orogun, Ibadan (completed)
    2. Expansion of river bank at Kudeti, Ibadan (completed)
    3. Channelisation of Ogbere River (North), Ibadan (completed)
    4. Channelisation of Agodi River, Ibadan (completed)
    5. Construction of culverts in the following areas in Ibadan:
      1. 1-cell (4 x 2) metres culvert, Ajibode Road, NISER Area, Ibadan (completed)
      2. 1-cell (3.5 x 1.5) metres culvert, Odogbo Fatokun Area, Moniya, Ibadan (completed by another agency)
      3. 1-cell (3 x 2) metres culvert across Ibadan-Ife Expressway close to Iwo Road Interchange, Ibadan (completed by Kopek Construction Ltd as part of the Ibadan-Ife Expressway FG project)
      4. 1-cell (4 x 2) metres culvert along Apete – Awotan Road, Ibadan (completed)
      5. 2-cell (6 x 2) metres culvert, Jerusalem Area, Ojoo-Arulogun Road, Ibadan (completed)
      6. 6-cell (6 x 2.5) metres culvert, Ariyo River, along Olorunsogo-Amuloko-Akanran-Dagbolu Road, Ibadan (not yet commenced)
      7. 1-cell (4 x 3) meters box Culvert on Ogbere River at Seriki-Adeyalo about 1 km upstream of Ogbere-Tioya (completed)
      8. 2-Cell Box Culvert across the Ibadan-Lagos Expressway, around Mufu Laninhun Comprehensive College (completed)
      9. 2-cell (6 x 2.5) metres  across the Ibadan-Lagos Expressway near Onipepeye (completed)
      10. 5-cell (6 x 2) metres culvert at UI-Ojoo Highway along the channelisation of Orogun River (culvert yet to commence)
      11. 3-cell (6 x 2) metres culvert at GOFAMINT church, Orogun (completed)
      12. 2-cell (6 x 2.5) metres culvert at Akinwumi/Odewenma Street near Iwo Road Interchange (completed)
      13. 2-cell (6 x 2) metres culvert at Kajorepo Community across the Iwo Road-Ojoo Expressway (completed)
      14. 3-cell (5 x 2) metres culvert at Kajola Area, over Orogun River (not yet commenced)
      15. 2-cell (6 x 2) metres access culvert into Kajorepo community, off Ojoo-Iwo Road (completed)
      16. 1-cell (8 x 2.5) metres culvert at Labo/Oranyan/Bere Road by Bovas Filling Station (completed)
      17. 1-cell (8 x 2.5) metres culvert at Adekile, Orita Aperin, Ibadan (completed)
      18. 2-cell (4 x 2) metres culvert at Army Barracks, off Ojoo Road (completed)
      19. 2-cell (4 x 2.5) metres culvert at Agodi River at Ladoke Akintola Street, New Bodija, Ibadan (nearly completed)
      20. 2-cell (6 x 2.5) metres culvert at Oduduwa Street by BON Hotel, Old Bodija, Ibadan (nearly completed)
      21. 2-cell (6×2.5) metres culvert at Francis Okediji Street, Old Bodija, Ibadan (completed)
      22. 2-cell (6 x 2.5) metres culvert across Agodi River on Layi Osunkunle Street, by Davis Hotel, Old Bodija, Ibadan (completed)
    6. Construction of bridges in the following areas in Ibadan:
      1. Construction of 15 metres span bridge at Believers Stream, Odo Ona Elewe Road (completed)
      2. 4-cell (6 x 3) metres bridge, Ogbere-Tioya, along Olorunsogo-Amuloko-Akanran-Dagbolu Road, Ibadan (completed)
      3. 4-cell (6 x 2.25) metres Oorelope-Zartech Bridge, Oluyole Estate, Ibadan (completed)
      4. 2 footbridges (25 x 2.3) metres across the Kudeti Stream at Labo, Oranyan area Ibadan (ongoing)
      5. Reconstruction of the Bridge on Ona River, Agara Akala Way, New Garage, Ibadan (completed)
      6. Reconstruction of the Bridge at Odo Ona Kekere, along Ijebu Ode Road (completed)
      7. Reconstruction of the bridge on Ona River, at Odo Ona, Apata area by St Paul’s Church along Abeokuta Road (completed)
      8. Reconstruction of the bridge on Zartech-7UP Road, Oluyole (completed)
      9. Construction of a support bridge along Alaafin Avenue, Oluyole Estate, close to Rhema Chapel
  12. Construction of housing estates:
    1. Bodija Premium Housing Estate, Bodija, Ibadan (ongoing)
    2. Kommi Prime Estate, Bodija, Ibadan (completed)
    3. Rayfield Gardens at ARCEDEM, Wofun, Ibadan (ongoing)
    4. Owode Estate Project, Apata, Ibadan (ongoing)
    5. Greenland Estate, Jericho, Ibadan (ongoing)
    6. Splendor Homes and Villas, Onireke G.R.A., Ibadan (ongoing)
    7. Ojongbodu Estate Project, Oyo (ongoing)
    8. Bode Thomas Housing Estate, Oyo (ongoing)
    9. Ajilete Housing Estate, Ogbomoso (ongoing)
  13. Development of Government Reserved Areas (GRAs):
    1. Development of infrastructure facilities at the Senator Rashidi Adewolu Ladoja GRA, Lagos-Ibadan Expressway, Ibadan (ongoing and sold out)
    2. Development of Engr Lere Adigun GRA Basorun, Ibadan (completed and sold out)
    3. Development of Chief Michael Adeniyi Koleosho GRA, Iroko, Ibadan-Oyo Expressway (ongoing)
  14. Pacesetter Industrial Park Pilot Scheme (ongoing)
  15. Renovation of the Oyo State Housing Corporation, Bodija, Ibadan (completed)
  16. Reconstruction of Akesan Market, Oyo (completed)
  17. Construction of Slaughterhouse, Ogbomoso (completed)
  18. Installation of a Digital Satellite Audio Network at the Broadcasting Corporation of Oyo State (BCOS) (completed)
  19. Donation of an operational vehicle and a fire truck to Ibadan Airport
  20. Construction of a 500,000-litre capacity Aviation Fuel Dispensing Facility at the Ibadan Airport (completed)
  21. Reconstruction of Ojoo Police Station, Ibadan (completed)
  22. Construction of permanent fire station at Atiba Local Government Area, Oyo (ongoing)
  23. Construction of permanent fire station at Ibarapa Central Local Government Area, Igboora (ongoing)
  24. Remodelling and Upgrade of Oyo State High Court, Ring Road and Magistrate Court, Iyaganku, Ibadan (ongoing)
  25. Consistent payment of workers’ salaries on the 25th day of every month
  26. Payment of outstanding pensions and gratuities (over N21 billion)

  1. Oyo State Community and Social Development Agency (CSDA) Projects:
  1. CSDA Micro-Projects between 2019 and 2020 in 38 communities
    1. Drilling and Installation of 55 motorised boreholes
    2. Installation of 25 transformers
    3. Construction of 6 culverts and 1 lined drain
    4. Construction of 6 toilets and 2 bathrooms
    5. Construction and completion of 4 health centres
    6. Completion of 1 community hall
    7. Construction of 2 schools
    8. Construction/Renovation of blocks of 21 classrooms
    9. Construction of 4 offices
    10. Execution of 19 electricity extensions and rehabilitation of 1 electricity extension
    11. Construction of 1 science laboratory
    12. Construction and renovation of 3 corps members’ lodge
    13. Completion of a students’ hostel
    14. Construction of a police station
  2. Replicated OSCSDA Micro-Projects between 2020 and 2021 in 10 communities
    1. Drilling and installation of 3 motorised boreholes
    2. Installation of 5 transformers
    3. Construction of 3 culverts
    4. Construction and completion of 1 health centre
    5. Construction of a police post
  3. Oyo CARES CSDA Micro-Projects between 2021 and 2022 in 9 communities
    1. Drilling and installation of 28 motorised boreholes
    2. Construction of 1 toilet
    3. Construction and completion of 2 health centres
    4. Construction blocks of 3 classrooms and 2 offices
  4. Completed (NG-CARES) CSDA Micro-Projects between 2022 and 2023 in 29 communities
    1. Construction of 5 blocks of 3 Classrooms
    2. Renovation of 6 blocks of 3 Classrooms
    3. Renovation of 1 block of 6 Classrooms
    4. Renovation of 1 block of 4 Classrooms
    5. Renovation of 2 blocks of 5 Classrooms
    6. Construction of 5 Offices
    7. Construction of 6 Toilets
    8. Construction of 7 Toilets with 3 units
    9. Renovation of 1 Toilet with 4 units
    10. Provision of Furniture to 15 communities
    11. Construction of 1 Examination Hall
    12. Drilling of 24 units of Motorised Borehole
    13. Drilling of 24 units of Motorised Borehole (Stand-alone)
    14. Drilling of 2 units of Solar-powered Borehole
    15. Drilling of 1 unit of Solar-powered Borehole (Stand-alone)
    16. Renovation of 1 Health Centre
    17. Construction of 1 Health Centre with Equipment & Furniture
    18. Construction of 4 Community Health Centres
    19. Provision of Equipment to 4 Community Health Centres
    20. Construction of 2 Culverts

You may view a list of other projects executed by Local Government Councils as of 18 November 2024 here.