Skip to content

Update on the Ongoing Expansion of the Orogun River Bank, Ibadan

Picture of a constructed culvert along the Orogun River Bank expansion taken on 6th February 2023

An update and pictures of the ongoing expansion of the Orogun River Bank along UI-Ojoo Highway, Ibadan. The project is a World Bank-assisted one for the construction of the first pool of long-term investments for flood control undertaken under the Ibadan Urban Flood Management Project (IUFMP). More about the IUFMP is contained here.

The expansion of the Orogun River Bank also includes a 5-cell (6 x 2)metres culvert. Other ongoing IUFMPs including river expansions are at Orita AperinAgodi, Kudeti, Oluyole Estate and Ogbere North in Ibadan. View a list of 24 ongoing IUFMPs in Oyo State here.

Below is a slideshow of pictures of the ongoing expansion of the Orogun River Bank, Ibadan:

  • DSC02280
  • DSC02385
  • DSC02343
  • DSC02292
  • DSC02337
  • DSC02363
  • Picture of a constructed culvert along the Orugun River Bank expansion taken on 6th February 2023
  • DSC02358
  • DSC02376
  • DSC02273
  • DSC02315
  • DSC02371
  • DSC02327
  • DSC02366
  • DSC02284

Leave a Reply