An update on the ongoing expansion of the river bank at Ogbere-Tioya, Ibadan under the Ibadan Urban Flood Management Project (IUFMP). Read more about the IUFMP here. This World Bank assisted project is for the construction of the first pool of long term investments for flood control at Agodi, Orogun, Kudeti and Ogbere North in Ibadan.
Below is a slideshow of pictures of the ongoing river bank expansion at Ogbere-Tioya, Ibadan:
Ogbere-Tioya, Ibadan IUFMP (1) Ogbere-Tioya, Ibadan IUFMP (2) Ogbere-Tioya, Ibadan IUFMP (3) Ogbere-Tioya, Ibadan IUFMP (4) Ogbere-Tioya, Ibadan IUFMP (5) Ogbere-Tioya, Ibadan IUFMP (6) Ogbere-Tioya, Ibadan IUFMP (7) Ogbere-Tioya, Ibadan IUFMP (8) Ogbere-Tioya, Ibadan IUFMP (9) Ogbere-Tioya, Ibadan IUFMP (10) Ogbere-Tioya, Ibadan IUFMP (11) Ogbere-Tioya, Ibadan IUFMP (12)