Skip to content

Ongoing IUFMP : Expansion of the River Bank at Ogbere-Tioya, Ibadan

An update on the ongoing expansion of the river bank at Ogbere-Tioya, Ibadan under the Ibadan Urban Flood Management Project (IUFMP). Read more about the IUFMP here. This World Bank assisted project is for the construction of the first pool of long term investments for flood control at Agodi, Orogun, Kudeti and Ogbere North in Ibadan.

Below is a slideshow of pictures of the ongoing river bank expansion at Ogbere-Tioya, Ibadan:

  • IUFMP Ogbere Tioya 4
  • IUFMP Ogbere Tioya 1
  • IUFMP Ogbere Tioya 7
  • IUFMP Ogbere Tioya 3
  • IUFMP Ogbere Tioya 9
  • IUFMP Ogbere Tioya 5
  • IUFMP Ogbere Tioya 10
  • Picture of river bank expansion at Ogbere-Tioya, Ibadan on January 06, 2022
  • IUFMP Ogbere Tioya 11
  • IUFMP Ogbere Tioya 8
  • IUFMP Ogbere Tioya 12
  • IUFMP Ogbere Tioya 14

Leave a Reply