Skip to content

Ongoing IUFMP : Expansion of the River Bank at Orogun, Ibadan

Picture of Orogun river bank expansion in Ibadan under the IUFMP taken on January 25, 2022

An update on the ongoing expansion of the river bank at Orogun, Ibadan under the Ibadan Urban Flood Management Project (IUFMP). We answer your questions about the IUFMP here. This World Bank assisted project is for the construction of the first pool of long term investments for flood control at Agodi, Orogun, Kudeti and Ogbere North in Ibadan.

Below is a slideshow of pictures of the ongoing river bank expansion at Orogun:

  • IUFMP 1
  • IUFMP 2
  • IUFMP 8
  • IUFMP 6
  • IUFMP 9
  • Picture of Orogun river bank expansion in Ibadan under the IUFMP taken on January 25, 2022
  • IUFMP 14
  • IUFMP 13
  • IUFMP 20
  • IUFMP 19
  • IUFMP 24
  • IUFMP 16

Leave a Reply