Skip to content

LGA Project Update: Reconstruction of the 6.45 km Olodo Garage-Kasumu-Ajia Junction Linking Erunmu-Egbeda Road

Picture of the reconstruction of the 6.45 km Olodo Garage-Kasumu-Ajia Junction linking Erunmu-Egbeda Road taken on 15 March 2024

A third update and pictures of the reconstruction of the 6.45 km Olodo Garage-Kasumu-Ajia Junction linking Erunmu-Egbeda Road. The Olodo Garage-Kasumu-Ajia Junction reconstruction project which the Egbeda Local Government Council is executing, commenced in October 2023 and was awarded to Fax Consult Ltd. It is estimated to be completed by April 2024.

The completion of the Olodo Garage-Kasumu-Ajia Junction reconstruction which includes the construction of hydraulic structures, earthworks and asphaltic tarring will help in the control and flow of water in the area and provide a seamless flow of traffic, reducing gridlocks in that axis.

The Olodo Garage-Kasumu-Ajia Junction reconstruction project is one of the numerous projects local government councils continue to execute for the benefit of residents in their various local government areas. A few others are located in Afijio, Ona AraLageluIdoOluyoleIwajowa, etc. and more here.

Below is a slideshow of pictures of the ongoing reconstruction of the Olodo Garage-Kasumu-Ajia Junction Linking Erunmu-Egbeda Road:

  • DJI 0453
  • DSC00385
  • DJI 0479
  • DJI 0489
  • DJI 0490
  • DJI 0456
  • DJI 0448
  • DSC00383
  • Picture of the reconstruction of the 6.45 km Olodo Garage-Kasumu-Ajia Junction linking Erunmu-Egbeda Road taken on 15 March 2024
  • DJI 0482
  • DSC00388
  • DJI 0485
  • DSC00360

1 thought on “LGA Project Update: Reconstruction of the 6.45 km Olodo Garage-Kasumu-Ajia Junction Linking Erunmu-Egbeda Road”

  1. Pingback: Ongoing LGA Project: Construction of Iyana Opa-Musa/Ifesowapo Road 1, 2, 3 off Ikumapayi Road, Olodo Garage (1 km) | Oyo State Feedback Service

Leave a Reply