Ongoing LGA Project: Construction of Iyana Opa-Musa/Ifesowapo Road 1, 2, 3 off Ikumapayi Road, Olodo Garage (1 km)

Picture of the construction of Iyana Opa-Musa/Ifesowapo Road 1, 2, 3 off Ikumapayi Road, Olodo Garage taken on 15 March 2024

An update and pictures of the ongoing construction of Iyana Opa-Musa/Ifesowapo Road 1, 2, 3 off Ikumapayi Road, Olodo Garage (1 km) being executed by the Egbeda Local Government Council. The Iyana Opa-Musa/Ifesowapo Road construction project was awarded to Fax Consult Ltd.

The Iyana Opa-Musa/Ifesowapo Road project includes the construction of hydraulic structures, earthworks and asphaltic tarring of the road. The Egbeda Local Government Council is also executing the 6.45 km Olodo Garage-Kasumu-Ajia Junction reconstruction project. A few other LGA projects are located in AfijioOna AraLageluIdoOluyoleIwajowa, etc. and more here.

Below is a slide show of pictures of the ongoing construction of Iyana Opa-Musa/Ifesowapo Road 1, 2, 3 off Ikumapayi Road, Olodo Garage (1 km):

  • DSC00381
  • DJI 0468
  • Picture of the construction of Iyana Opa-Musa/Ifesowapo Road 1, 2, 3 off Ikumapayi Road, Olodo Garage taken on 15 March 2024
  • DSC00373
  • DJI 0462
  • DSC00376
  • DJI 0473
  • DSC00380
  • DSC00382
  • DJI 0464

1 thought on “Ongoing LGA Project: Construction of Iyana Opa-Musa/Ifesowapo Road 1, 2, 3 off Ikumapayi Road, Olodo Garage (1 km)”

  1. Pingback: Progress Report: LGA Reconstruction of the 6.45 km Olodo Garage-Kasumu-Ajia Junction Linking Erunmu-Egbeda Road | Oyo State Feedback Service