Skip to content

Ongoing Project: Dualisation of the 9.7km Saki Township Road

Picture of Saki Township Road dualisation

An update on the ongoing dualisation of the 9.7km Saki Township Road. This Oyo State project was re-awarded in September 2020 and is expected to be completed by September 2021.

Below is a slideshow of pictures of Saki Township Road.

  • Saki Dualisation 8
  • Saki Dualisation 9
  • Saki Dualisation 11
  • Saki Dualisation 6
  • Saki Dualisation 1
  • Saki Dualisation 2
  • Saki Dualisation 14
  • Saki Dualisation 15
  • Saki Dualisation 16
  • Saki Dualisation 17
  • Saki Dualisation 18
  • Picture of Saki Township Road dualisation taken on April 06, 2021

Leave a Reply