Skip to content

The Construction of 65 Metres General Gas Flyover, Ibadan is Nearly Complete

Picture of General Gas Flyover taken on 19th August 2022

An update and pictures of the ongoing construction of the 65 metres General Gas Flyover, Ibadan. The project was flagged off by Governor Seyi Makinde on March 17, 2021, and is now nearing completion. It is estimated to be completed before the end of 2022. The General Gas Flyover links Basorun to General Gas, Akobo and is already addressing the traffic gridlock at the Akobo Road axis.

Below is a slideshow of pictures of the General Gas Flyover, Ibadan:

  • General Gas Flyover 5
  • General Gas Flyover 6
  • General Gas Flyover 2
  • General Gas Flyover 1
  • General Gas Flyover 7
  • Picture of General Gas Flyover taken on 19th August 2022
  • General Gas Flyover 10
  • General Gas Flyover 13
  • General Gas Flyover 14
  • General Gas Flyover 9
  • General Gas Flyover 18
  • General Gas Flyover 8
  • General Gas Flyover 16

1 thought on “The Construction of 65 Metres General Gas Flyover, Ibadan is Nearly Complete”

  1. Pingback: Completed Project: Construction of the 65m General Gas Flyover, Ibadan | Oyo State Feedback Service

Leave a Reply