Here is an updated comprehensive list of projects executed by Local Government Councils of Oyo State as of 8 December 2025.
All 33 Local Government Areas


| S/N | LOCAL GOVERNMENT AREA | NAME OF PROJECT | NO. OF KM | CONTRACTOR | APPROVED DATE | REMARKS |
| 1 | The 33 Local Government Areas | Construction of mini stadia and practising pitches within the State | Peculiar Ultimate Concerns Limited | 2020 | Ongoing | |
| 2 | The 33 Local Government Areas | Construction of Oyo State Local Government Service Commission Building Complex at the Government Secretariat | 2020 | Work completed | ||
| 3 | The 33 Local Government Areas | 99 Security vehicles | De-Damak | 23/01/23 | Work completed | |
| 4 | ALGON | Rehabilitation of some roads in all Thirty-Three (33) Local Government Areas | OYSROMA | 31/03/23 | Work completed | |
| 5 | The 33 Local Government Areas | Grading and lateriting of Thirty (30) kms road across all the Thirty-Three (33) Local Governments in the State | 16/04/24 | Ongoing | ||
| 6 | The 33 Local Government Areas | Cost of official vehicles for all the 33 LGA Chairmen | 2023 | Work completed | ||
| 7 | The 33 Local Government Areas | Provision of accommodation for Security Operatives Manning Highways across the Thirty-Three (33) LGAs | AB-Bond Habitat Cont.Ltd | 25/08/25 | Ongoing | |
| 8 | The 33 Local Government Areas | Procurement of Yadea Electric Motorcycle (50 per Council) | I.O Fijabi and sons | 25/08/25 | Ongoing | |
| 9 | Ministry of Local Government and Chieftaincy Affairs | Limited Rehabilitation of the 38 km Igboora-Igangan-Iganna Road | 38 | K.G.B Nigeria Limited and Carboncor International Technology Limited | 17/03/22 | Works completed |
Ibadan Zone




| S/N | LOCAL GOVERNMENT AREA | NAME OF PROJECT | NO. OF KM | CONTRACTOR | APPROVED DATE | REMARKS |
| 1 | Egbeda | Construction of a double box culvert (4.2 X 3.6 X 12M) with reinforced concrete retaining walls and reinforced concrete drainages at Omi River Ogundipe, Ikumapayi, Olodo. | Musgo Nig Ltd. | 2021 | Work completed | |
| 2 | Akinyele Local Government Council | Construction of hydraulic structures, earthworks and asphaltic tarring of Olubadan Palace, Alarere, linking New Ibadan-Ife Road, beside Segelu Club (Road A) and the construction of hydraulic structures, earthworks and asphaltic tarring of Olubadan Palace Alarere, linking Lagos-Ibadan express road at Gospel Bus-stop area (Road B) | Mortayus Nig. Ltd. | 21/4/22 | Work completed | |
| 3 | Egbeda | Rehabilitate/asphaltic tarring of a. Olode-Aba Titi/Ogungbade (“LOT A”) and b. Ogungbade-Kukumoda- Ife/Ibadan express junction (“LOT B”). | BOPOY Nig. Ltd | 20/5/22 | Work completed | |
| 4 | Egbeda | Construction of proposed New Farmers’ Market. | BOPOY Nig. Ltd | 12/9/22 | Work completed | |
| 5 | Ibadan South LCDA | Construction of pedestrian bridge at Omikunle Community, pedestrian bridge at Omikunle Community, Ilupeju area. | Direct Labour | 12/9/22 | Work completed | |
| 6 | Ibadan South East | Construction of reinforced concrete drains and retaining walls, repair drains, earthworks and asphaltic concrete paving of Chief Bolaji Oladejo – Reverend P.F. Owa Crescent – Shittu Bello road, Adeyemo Layout, off Ibadan Grammar School. | Quick-Born Nig Ltd. | 29/9/22 | Work completed | |
| 7 | Ibadan South East | Construction and repairs of drains, culverts, retaining walls and asphaltic overlay of Oja’ba Central Mosque – Oranyan Primary Health Care Centre Road. | BOPOY Nig. Ltd | 29/9/22 | Work completed | |
| 8 | Ona-Ara Local Government Council | Rehabilitation of Oremeji Agugu to Express, Onigbese Stream Oremeji- Babanla to IGEM Church Airport Road 5.89km av.7.2m | Fax Consult Ltd. | 29/9/22 | Work completed | |
| 9 | Ibadan North East | Construction of asphaltic structure and asphaltic overlaying at Agugu-Oja junction- Flyover/Overhead bridge at Oremeji Agugu. | 2.3 5.89 | Quick-Born Nig Ltd. | 29/9/22 | Work completed |
| 10 | Egbeda | Re-construction of damaged portions of hydraulic structures, earthworks and asphaltic tarring of Alakia-Isebo, Iyana Church Road | 2.5 | BOPOY Nig. Ltd | 07/12/22 | Work completed |
| 11 | Egbeda | Re-construction of damaged portions of hydraulic structures, earthworks and asphaltic tarring of Olubadan Palace (Alarere) road extension | 2.1 | BOPOY Nig. Ltd | 07/12/22 | Work completed |
| 12 | Ibadan South West | Rehabilitation of NUT Secretariat Road at Oluyole Estate | BOPOY Nig. Ltd | 07/12/22 | Work completed | |
| 13 | Lagelu | Earthworks and paving of 720m Road 23, Basorun Housing Estate, Akobo | 720M | RO&A Nig. Ltd. | 14/12/22 | Work completed |
| 14 | Egbeda | Construction of hydraulic structures, earthworks and asphaltic tarring of Molade Focus junction-C.A.C. Primary School – Akuro junction, an access road linking from Wema Bank in New Ife Road to Monatan, Iwo road axis | Mortayus Nig. Ltd. | 14/12/22 | Work completed | |
| 15 | Ibadan North-West | · Asphaltic reconstruction of Police Mobile Force car park – the Stream, Police Mobile Force barrack road, Jericho; · Asphaltic rehabilitation/expansion and total overlay of Sijuade junction-Akeredolu house street – car park mobile force Barrack, Jericho Road; · Asphaltic rehabilitation of the main entrance gate road, Police central mosque, Commissioner’ Office – Police training school of Oyo State Police Headquarters, Eleyele. | RO&A Nig. Ltd. | 06/01/23 | Work completed | |
| 16 | Oluyole Local Government Council | Reconstruction of asphaltic pavement and hydraulic structures of Asunle-Arapaja-Odo Ona Kekere | 4.667 | Musgo Nig Ltd | 12/1/23 | Work completed |
| 17 | Ibadan North East Local Government Council | Reconstruction of earthworks, culvert and drains, and asphaltic paving of Abayomi Olagoke Akano – Raji Rasaki Atele Abayomi road – rehabilitation and asphaltic patching of Raji Rasaki junction – Bode Wasinmi, installation of solar light at Abayomi Olagoke Akano | 2.65 | Musgo Nig Ltd | 12/1/23 | Work completed |
| 18 | Akinyele | Construction of perimeter fence round the newly constructed farmer’s market | Mortayus Nig. Ltd. | 13/1/23 | Work completed | |
| 19 | Ona-Ara | Dualization and reconstruction of Olorunsogo Express/Ariyo area, Amuloko road, (Length-3.5KM) | 3.5 | Peculiar Construction | 13/1/23 | Work completed |
| 20 | Akinyele | Renovation and procurement of office furniture for the razed offices in Akinyele Local Government | Mortayus Nig. Ltd. | 13/1/23 | Work completed | |
| 21 | Ido Local Government Council | Construction of rubble stone, line drainage, access and cross culverts, earthworks and asphaltic tarring of Omi Adio junction to Ido junction (10km) | 10 | Samchase Construction Co. | 23/01/23 | Work completed |
| 22 | Egbeda | Installation of solar-powered street lights along Ibadan Airport dualized road, | G.W Scoepper Engineering Ltd. | 02/02/23 | Work completed | |
| 23 | Egbeda | Supply and installation of 100W integrated solar-powered street lights along 1.8KM internal road network within Ibadan Airport Alakia | G.W Scoepper Engineering Ltd. | 10/5/23 | Work completed | |
| 24 | Egbeda | Extension of water channels from the recently constructed box culvert at slaughter slab area, Alarere | BOPOY | 10/05/23 | Work completed | |
| 25 | Egbeda | Construction of hydraulic structures, earthworks and asphaltic tarring of Orisunmibare road, linking Lagos-Ibadan express road at Access Cathedral Area (Road A) | Peculiar Ultimate Concerns | 10/05/23 | Work completed | |
| 26 | Egbeda | Construction of hydraulic structures, earthworks and asphaltic tarring of Molade Focus junction-C.A.C. Primary School – Akuro junction, an access road linking from Wema Bank in New Ife Road to Monatan, Iwo Road axis Extension | Mortayus Nig. Ltd. | 10/05/23 | Work completed | |
| 27 | Lagelu | Dualization of Akobo Ojurin – Olorunda Abaa, Ibadan (Av. Width – 26.8m Length-5.9km) – Odogbo Barracks – Olorunda Abaa Junction by N. O. Idowu Comprehensive College | 6 | Samchase Construction Co. | 26/05/23 | Work completed |
| 28 | Ona-Ara | Rehabilitation of Oremeji/Agugu to Express, Onigbese Stream on Oremeji, Babanla Oniyangi, Community Grammar School to IGEM Church to Airport being additional work items | 2.5 | Fax Consult Ltd. | 2023 | Work completed |
| 29 | Egbeda | Construction of hydraulic structures, earthworks and asphaltic tarring of Iyana Opa-Musa/Ifesowapo Road 1, 2, & 3, Off Kumapayi Road, Olodo Garage | 1.02 | Fax Consult Ltd. | 15/09/23 | Work completed |
| 30 | Egbeda | Construction of hydraulic structures, earthworks and asphaltic tarring of Olodo garage – Kasumu/Ajia junction linking Erunmu-Egbeda Road at Owobaale Town | 6.45 | Fax Consult Ltd. | 15/09/23 | Work completed |
| 31 | Ona-Ara | Rehabilitation of Oremeji Agugu to Express, Onigbese Stream Oremeji- Babanla to IGEM Church Airport Road (Additional works) Work already done outside original BEME A. change of culvert size on Onigbese stream from 4.0m x 4.0m single cell to 3.0m x3.0m Triple cell; B. Change of Av. Pavement width from 7.2m to 8.5m over the entire road length of 5.98km; C. Road markings over the entire 5.98km length; i. Additional works of Slip Road 1 & 2 (420m; Av Width. 7.2m); ii. Road Extension to Airport Terminal (348m; Av width. 8.70m); iii. Proposed 4.5 x 3.0 single culvert at Sebioba; | 5.98 420m | Fax Consult Ltd. | 12/10/23 | Work Completed |
| 32 | Akinyele | Construction of Ilu Tuntun Road project along Akinyele – Alagbaa, Akingbala | 4.1 + 265m | Track Care Global Construction Ltd | 25/10/23 | Work completed |
| 33 | Egbeda | Construction of Olodo Bridge | Peculiar Ultimate Concerns Limited | 09/11/23 | Work completed | |
| 34 | Ibadan South West Local Government Council | Construction of hydraulic structure, earth works and asphaltic pavement of exit road at Jogor centre, Liberty Road | 890 | Bopoy | 09/11/23 | Work completed |
| 35 | Ibadan North | Rehabilitation (sectional overlay and asphaltic patching) of Dandaru – Agbadagbudu road (Length = 1.8Km) | 1.8 | BOPOY | 15/02/24 | Work completed |
| 36 | Ibadan North | Supply and installation of 100W integrated solar public lighting along Dandaru – Vine Branch Church – New Olu’badan Palace – Yemetu | Ministry of Energy | 29/02/24 | Work completed | |
| 37 | Ido | Construction of rubble stone, line drainage, access and cross culverts, earthworks and asphaltic tarring of Omi Adio junction to Ido junction (10km) (VARIATION) | Samchase Construction | 29/02/24 | Work completed | |
| 38 | Lagelu | Construction of Army Barracks fence (AKOBO OJURIN) | Samchase Construction | 29/02/24 | Work completed | |
| 39 | Ona-Ara | Construction of Ajia junction interchange | Peculiar Ultimate Concerns Limited | 06/03/24 | Ongoing | |
| 40 | Egbeda | Consultancy Services (Construction of Olodo Bridge) Payment No.1 | Aleng Consults | 07/03/24 | ||
| 41 | Ibadan North West | Construction of Link crescent road at Link reservation, Golf Course, Ibadan | 730M | AB-BOND Habitat Contractors Ltd | 16/04/24 | Work completed |
| 42 | Ibadan North | Rehabilitation of Oyo State Local Government Service Commission Building Complex at the Government Secretariat | AB-BOND Habitat Contractors Ltd | 29/04/24 | Work completed | |
| 43 | Egbeda | Construction of hydraulic structures, earthworks and asphaltic tarring of Olodo Garage – Kasumu/Ajia junction linking Erunmu-Egbeda Road at Owobaale Town Additional 2.1KM | 2.1 | Fax Consult Ltd. | 03/06/24 | Work completed |
| 44 | Ido | Construction of Ultra-Modern Omituntun Market of Omi-Adio market along Abeokuta Road | Sydam Concept. | 03/06/24 | Work completed | |
| 45 | Lagelu | Re-construction of Wofun Junction – Rail Line, Along Wofun/Kute Road | 1.34 | Samchase Construction | 11/06/24 | Work completed |
| 46 | Akinyele | Construction of Ilu Tuntun Road, along Akinyele – Alagbaa- Akingbala (Variation and Additional Works) | Track Care Global Construction Ltd | 14/06/24 | Work completed | |
| 47 | Egbeda | Construction Of Hydraulic Structure, Earthwork and Asphaltic Tarring Of Iyana- Opamusa/Ifesowapo Road 1,2,3,4 Off Ikumapayi Road, Olodo Garage (Variation) | Fax Consult | 01/08/24 | Work completed | |
| 48 | Egbeda | Construction of 2 x 2 metres span bridge over Egberi river at Olodo along Ibadan-Iwo express road in Egbeda Local Government (Variation) | Peculiar Ultimate Concerns Limited | 01/08/24 | Work completed | |
| 49 | Ibadan North | Asphaltic Repairs/Overlay of selected roads within the Local Government Area | Samchase Construction | 01/08/24 | Ongoing | |
| 50 | Ibadan South East | Asphaltic Pavement Overlay, Retaining Walls and Hydraulic Structures of Road from Eleta (Church) – Academy Overhead Bridge. Length: 3KM; Average Width: 9.5M | 3 | AB-BOND Habitat Con. Ltd | 01/08/24 | Work completed |
| 51 | Oluyole | Construction of a gate house, entrance and exit roads, rigid pavement, solar lighting and perimeter fencing at First Technical University, Ibadan | AB-BOND Habitat Con. Ltd | 01/08/24 | Work completed | |
| 52 | Ibadan South West | Rehabilitation of Alalubosa – Olubadan residence road, Alalubosa Estate | BOPOY Nigeria Limited | 26/09/24 | Work completed | |
| 53 | Ibadan South West | Construction of proposed palace at Fijabi compound, Orita Merin, Ibadan | Samchase Construction | 20/10/24 | Ongoing | |
| 54 | Ibadan North East | Construction of Culverts, Drains, Earthworks and Asphaltic Paving of Araromi Market road, with Modern Park at Gate within the jurisdiction of the Council – 3KM | Track Care Global Construction | 18/11/24 | Ongoing | |
| 55 | Lagelu | Construction of Proposed Akobo Micra (Taxi) and Tricycle (Maruwa) Park at General Gas, Akobo Area | Samchase Construction | 19/11/24 | Ongoing | |
| 56 | Lagelu | Construction of proposed Akobo Tricycle (Maruwa) and Motorcycle (Okada) Park at General Gas, Akobo Area | Samchase Construction | 19/11/24 | Ongoing | |
| 57 | Oluyole | Construction of 2 Gate Houses, Entrance and Exit roads, Rigid Pavement, Solar Street Lighting and Perimeter Fencing of First Technical University, Ibadan (Construction of Underpass Road and Drainage Construction Linking Ibadan-Lagos Expressway via Technical University) | AB-BOND Habitat Con. Ltd | 26/11/24 | Work completed | |
| 58 | Egbeda | Construction of Hydraulic Structures, Earthworks and Asphaltic Tarring of Monatan junction (Beside SAO Filling Station) – Adogba – Ebenezery (to link Iyana Church-Alakia Road) and Agoro Junction (Length: 5.1Km; Av. Width: 10m) | AB-BOND Habitat Con. Ltd | 26/11/24 | Ongoing | |
| 59 | Egbeda | Construction of hydraulic structures, earthworks and asphaltic tarring of Jinarere II, community roads, linking Ibadan-Iwo road Expressway at Dizengoff area – 2.45M | BOPOY Nig. Ltd | 26/11/24 | Ongoing | |
| 60 | Ibadan South West | Installation of transformer at the Aafin Olubadan of Ibadan (Additional Request) | Min. of Energy | 02/12/24 | Work completed | |
| 61 | Lagelu Local Government Council | Augmentation/review of contract sum on the dualisation of Akobo-Ojuirin-Olorunda Abaa/Odogbo Barracks-Olorunda Abaa Junction by N.O. Idowu Comprehensive College and re-construction of demolished Barracks Fence/Shopping Complex, Ibadan | Samchase Construction | 14/01/25 | Work Completed | |
| 62 | Egbeda | Construction of Hydraulic Structures, Earthworks and Asphaltic Tarring of Orisunmibare Roads Linking Lagos/Ibadan Expressway through Bunker Street; Linking Old Ife Road Expressway at Olaogun through Bamigbade Street; Linking Alarere Road through Onigbagbo Street and Linking Wema – All Motors Road @ Redeemed Church Area | Peculiar Ultimate Concerns Limited | 15/01/25 | Ongoing | |
| 63 | Ibadan North East | Construction of hydraulic structures and asphaltic overlay of Abayomi Holy Trinity Estate, Old Ife road | BOPOY Nig. Ltd | 28/02/25 | Ongoing | |
| 64 | Oluyole | Construction of a section of the Ring Road at First Technical University, Ibadan | AB-BOND Habitat Con. Ltd | 03/03/25 | Ongoing | |
| 65 | Oluyole | Construction of an underpass road at Bare Village linking Lagos-Ibadan Expressway | AB-BOND Habitat Con. Ltd | 03/03/25 | Ongoing | |
| 66 | Akinyele | Construction of Bodija-Aduloju-Ajao/Living Spring Chapel road, Moniya | BOPOY Nig. Ltd. | 03/03/25 | Ongoing | |
| 67 | Egbeda Local Government Council | Variation on the construction of hydraulic structures, earthworks and asphaltic tarring of Olodo Garage-Kasumu/Ajia junction/Aba Isale via Owobaale Town | Fax Consult Ltd | 04/04/25 | Ongoing | |
| 68 | Ibadan North | Reconstruction of Olive Estate Internal Roads, Agodi-GRA. | 3.1 | Track Care | 04/04/25 | Work completed |
| 69 | Ibadan North | Re-construction of 3.1 KM Awosika, Rotimi and Oba Akinyele Ring Road – Awolowo | Track Care | 04/04/25 | Ongoing | |
| 70 | Ibadan North East | Purchase, installation and energising of 500/11KVA transformer at various locations | 28/04/25 | Ongoing | ||
| 71 | Oluyole | Construction and furnishing of College Health Centre for Abiola Ajimobi Technical University, Ibadan | AB-BOND Habitat Con. Ltd | 28/4/2025 | Ongoing | |
| 72 | Lagelu | Dualisation of 2.8 km New Olodo Bridge – Infectious Disease Centre (IDC) Section of Iwo road interchange – Oyo State boundary road at Odo-Oba, Ibadan | 2.8 | Peculiar Ultimate Concerns Limited | 21/05/20 | Ongoing |
| 73 | Ido | Construction of road network– and walkway for Omi-Tuntun Ultra Modern Market and External works (Perimeter fence, plastering, gate etc) | Sydam Concept | 02/06/25 | Ongoing | |
| 74 | Ibadan South West | Variation on the construction and furnishing of Fijabi Palace | ISKAT Design Limited | 11/06/25 | Ongoing | |
| 75 | Ona-Ara Local Government Council | Dualisation of Ariyo-Amuloko-Odeyale Junction | Samchase Construction | 25/07/25 | Ongoing | |
| 76 | Ibadan North | Construction of 2 KM Bodija main market road, Bodija – Ibadan | Uptown Diamonds & Landscaping Ltd | 25/08/25 | Ongoing | |
| 77 | Ibadan North | Release of fund for the change of Manor Park estate to Hon. Aderemi Jagaban Estate, along NASFAT Praying Ground, Samonda | — | 25/08/25 | Work Completed | |
| 78 | Egbeda | Construction of Hydraulic Structures, Earthworks and Asphaltic Tarring of Opa Musa Extension Road, Olodo, Ibadan | Fax Consult Limited | 25/08/25 | Ongoing | |
| 79 | Ibadan South East | Construction of drains, culverts, earthwork and asphaltic overlay of Eleta Junction–Odinjo with Spur at Left Side of Overhead Bridge | — | 25/08/25 | Ongoing | |
| 80 | Egbeda | Construction of Hydraulic Structures, Earthworks and Asphaltic Tarring of Enyo Filling Station (Olodo) – Agandi-Emu Area – Alaja Area Odan Junction – Egba (Egbeda/Lagelu Boundary) Road and Agandi/Ayeloja Road (Length: 5.8 Km; Av. Width: 8.8m) | BOPOY Nig. Ltd. | 25/08/25 | Ongoing | |
| 81 | Akinyele | Construction of bonded warehouse and container terminal project at Ilu-Tuntun business district, Moniya. | Green Marcel Nigeria Ltd. | 29/9/25 | Ongoing | |
| 82 | Ibadan North | Procurement and installation of 300KVA 11 Transformers at Osuntokun, Sango and Ikolaba Areas in the Local Government | 17/10/25 | Ongoing | ||
| 83 | Ibadan South West | Ibadan Junction Improvement Works (JIW) and urban renewal project. | Axford Bridge Nigeria Limited | 17/10/25 | Ongoing | |
| 84 | Ibadan South West | Construction of drains, culverts earthworks and asphaltic pavement of Commissioner of Police residence road, Goodwill Estate road / Alesinloye junction – Forestry – Foodco – Golden Tulip and Jericho Junction Road. | Quickborn Nigeria Limited | 17/10/25 | Ongoing | |
| 85 | Lagelu | Reconstruction of Akala Road (Olundegun Junction/Tesmore Junction Road) Length=3.79 KM, Average width=9.30M | Samchase | 11/11/25 | Ongoing | |
| 86 | Lagelu | Engineering Supervision of On-going Projects (Submission of Invoices No. 22, 23 & 24) | Messrs. FINDAssociates | 11/11/25 | Ongoing |
Ibarapa Zone


| S/N | LOCAL GOVERNMENT AREA | NAME OF PROJECT | NO. OF KM | CONTRACTOR | APPROVED DATE | REMARKS |
| 1 | Ibarapa East | Rehabilitation of Eruwa to Maya Road. | 14.1 | Brightlight Con. Ltd. | 19/9/22 | Work completed |
| 2 | Ibarapa North | Rehabilitation of boundary of Ibarapa Central – boundary of Iganna | 6.2 | QuickBorn Nig Ltd. | 22/11/22 | Work completed |
| 3 | Ibarapa Central | Rehabilitation of Igbole express road to the Local Government boundary (Ofiki River Junction) L=15,750m, Av. Width = 9m and paved area = 45,500M2, | 15,750M | QuickBorn Nig Ltd. | 14/12/22 | Work completed |
| 4 | Ibarapa East | Construction of double cell doubly reinforced culvert and asphaltic double lane tarring of Oyo State College of Education Road, Lanlate – Ibarapa East, Eruwa. | Brightlight Con. Ltd. | 01/08/24 | Ongoing | |
| 5 | Ibarapa Central | Construction of doubly reinforced concrete box culvert 3M x 3M (double Cell) with stream channelisation at Odo Ayin, Isale Oba, Igboora | AB-BOND Habitat Con. Ltd. | 01/08/24 | Ongoing | |
| 6 | Ibarapa Central | Construction of a reinforced box culvert at Aiyerimina | Direct LABOUR | 26/11/24 | Work completed | |
| 7 | Ibarapa Land | Construction of some selected roads and reinforced box culverts in Ibarapa Land | Direct LABOUR | 06/01/25 | Work completed | |
| 8 | Ibarapa Central | Construction of box culverts, reconstruction of failed box culverts and installation of speed breakers in various locations | Direct LABOUR | 13/01/25 | Work completed | |
| 9 | Ibarapa Central | Construction of 2M X 2M x 7.5M Reinforced Concrete Box culvert along Apata Giri village, Sagan-un | Direct LABOUR | 13/01/25 | Ongoing | |
| 10 | Ibarapa Central | Renovation of Olu of Igbo-Ora’ Palace and construction of its perimeter fence | Direct LABOUR | 14/01/25 | Ongoing | |
| 11 | Ibarapa East | Complete renovation of Eruwa Palace. | Mortayus | 04/04/25 | Ongoing | |
| 12 | Ibarapa Central | Construction of double cell, double reinforced concrete box culvert with uncovered reinforced concrete drains at Opeleki river Isale Oba, Igboora | 28/04/25 | Ongoing | ||
| 13 | Ibarapa East | Additional work on complete renovation of the Eleruwa Palace – Phase 1 (Entrance Gate Canopy and Entrance Porch) | Mortayus | 17/10/25 | Work completed | |
| 14 | Ibarapa Central | Furnishing and installation of solar inverters at the Olu of Igbo-Ora Palace | 11/11/25 | Ongoing | ||
| 15 | Ibarapa East Local Government Council | Demolition and Reconstruction of Residential Lodge and Palace Hall. | Mortayus | 11/11/25 | Ongoing |
Ogbomoso Zone
| S/N | LOCAL GOVERNMENT AREA | NAME OF PROJECT | NO. OF KM | CONTRACTOR | APPROVED DATE | REMARKS |
| 1 | Ogbomoso South | Spot patching and overlay of Methodist Church, Arowomole Junction – Laka Epo Adeoye Junction – Oke Alapata – Akunko | QuickBorn Nig Ltd. | 22/11/22 | Work completed | |
| 2 | Ogbomoso North | Construction of culvert, drains, earthworks and asphaltic paving of Ogbegun Junction – Papa Ologbin Road | RO&A Nig. Ltd. | 22/11/22 | Work completed | |
| 3 | Oriire | Construction of additional reinforced concrete double cells culvert, reconstruction of collapsed ruble stone retaining wall with reinforced concrete retaining wall and laterite earth backfilling of eroded carriage-way at Idekun Stream in Iluju | QuickBorn Nig Ltd. | 22/11/22 | Work completed | |
| 4 | Surulere | Construction of hydraulic structure, earthworks and asphaltic pavement of INEC Junction to School Board Junction | 1 | RO&A Nig. Ltd. | 10/05/23 | Work completed |
| 5 | Ogbomoso South | Construction of Proposed Ultra-Modern Kajola Market, Arowomole | Sydam Concept. | 24/11/23 | Ongoing | |
| 6 | Ogbomoso South | Construction of Proposed Ultra-Modern Kajola Market, Arowomole – (Variation) | Sydam Concept. | 01/08/24 | Work completed | |
| 7 | Iseyin/ Ogbomoso Local Government Councils | Installation of Weighbridge Systems on the construction of Iseyin-Apewo village Junction Ahoro-Dada-Fapote-Ogbomoso Road (Lots 1 & 2) | Ministry of Public Works | 01/08/24 | Ongoing | |
| 8 | Ogbomoso South | Renovation of Oba Onpetu of Ijeru Kingdom Palace | DIRECT LABOUR | 20/10/24 | ||
| 9 | Ogbomoso North | Erection of collapsed roof truss with roofing sheet, ceiling, installation of electric fittings and painting of Soun Ogunlola Town Hall, Ogbomoso | APTLYSAFE INT.LTD | 13/01/25 | Ongoing | |
| 10 | Ogbomoso North | Payment to Contractor for refurbishment project at the Soun’s Palace | 03/03/25 | Ongoing | ||
| 11 | Ogbomoso South | Renovation of Oba Onpetu of Ijeru Kingdom Palace (Variation) | 03/03/25 | Ongoing | ||
| 12 | Iseyin/ Ogbomoso Local Government Councils | Installation of Weighbridge Systems on the construction of Iseyin-Apewo village Junction Ahoro-Dada-Fapote-Ogbomoso Road (Lots 1 & 2) (REVIEW OF PRICES) | Ministry of Public Works | 03/03/25 | One-off | |
| 13 | Surulere | Construction of Modern Day Market at Orile-Igbon | Soultwin Nigeria Ltd. | 01/08/25 | Ongoing |
Oke-Ogun Zone


| S/N | LOCAL GOVERNMENT AREA | NAME OF PROJECT | NO. OF KM | CONTRACTOR | APPROVED DATE | REMARKS |
| 1 | Iwajowa | Construction of culvert, drains, earthworks and asphaltic paving of Idiko-Ile to Ayegun road | 6 | SPG Construction | 07/12/22 | Work completed |
| 2 | Atisbo | Construction of reinforced concrete box culvert, backfilling and line drainages of 1.5 x 2.0m at Irawo-Owode, Irawo-Ile Road | Direct Labour | 22/11/22 | Work completed | |
| 3 | Iseyin | Construction of reinforced concrete culverts, rubble stone drains and retaining walls, earthworks and asphaltic concrete paving of Asado/Justice Ariwoola-Bayo Raji quarters to K.S.B. Filling Station Road. | RO&A Nig. Ltd. | 14/12/22 | Work completed | |
| 4 | Iseyin | Construction of 100m fence wall to the gate house. Construction and overlay of Ladoke Akintola University of Technology (LAUTECH), Iseyin campus road network-major roads (dual) with street light; | AB-Bond Con. Ltd. | 06/01/23 | Work completed | |
| 5 | Iseyin | · Renovation and Modification of Iseyin City Hall · Grading and lateriting of Radamos Filling Station, Alagogo – Agbede/Idiemi – Alobo – Ikere Gorge Dam Road | FALLAH Multi System | 13/01/23 | Work completed | |
| 6 | Saki West | Reconstruction of Igboro shopping mall, opposite Okere Palace, Igboro area | Mortayus Nig. Ltd. | 13/1/23 | Work completed | |
| 7 | Three (3) Local Government Areas: Atisbo, Saki East and Saki West. | Drilling of motorised boreholes, casing installation of submersible pump, networking and construction of overhead tank-stand | Direct Labour | 02/02/23 | Work completed | |
| 8 | Iseyin | Extension of 33KV electricity feeder line from NYSC Orientation camp to LAUTECH, Iseyin Campus | AB-Bond Con. Ltd. | 25/04/23 | Work completed | |
| 9 | Iseyin | Construction of perimeter fence wall (frontage) at Ladoke Akintola University of Technology (LAUTECH), Iseyin campus | AB-Bond Con. Ltd. | 25/04/23 | Work completed | |
| 10 | Saki West | · Renovation of a block of classroom and supply of desktop computer system at Command Secondary School, Wewe Local Council Development Area · Installation of a Unit of 500KVA /11KV/415V Power transformer at Asabari in Wewe Local Council Development Area | Direct Labour | 10/5/23 | Work completed | |
| 11 | Iseyin | Constructions of external works for proposed 500 capacity lecture theatres, offices, conference rooms, power house earths, open & covered drains and services at LAUTECH (Iseyin Campus) | AB-Bond Con. Ltd. | 05/07/23 | Work completed | |
| 12 | Iseyin | Furnishing of Administrative building, Supply and Installation of Air Conditioners, Pipe laying, Cabling and control for 750- and 800-Seater for the Auditorium, Furnishing of offices, Classrooms and Box room of 500 Capacity Auditorium, Extension of Electricity to the existing blocks and proposed Market/Motor Park at the College of Agricultural Science and Renewable Natural Resources, LAUTECH, (Iseyin Campus) | AB-Bond Con. Ltd. | 07/08/23 | Work completed | |
| 13 | Iseyin | Construction of concrete pads and pole-mounted solar lights around the perimeter fence of LAUTECH, (Iseyin Campus) | AB-BOND Con. Ltd | 28/08/23 | Work completed | |
| 14 | Iseyin | · Construction of circular road linking all existing buildings and two Faculty building with road serving first auditorium hall, the laboratory, Hammed Raji (SAN) Lecture Hall and the 500-seater Lecture Hall linking major dual roads (Length = 1.6km, AV. Width = 7.3m) at LAUTECH, Iseyin Campus · Execution of ornamental works/landscaping of fence-wall frontage clearing of Five (5) hectares land space at the Hammed Raji Lecture Hall frontage, back sides of laboratory and 500 seaters Lecture Hall · Construction of perimeter fence with 100m block wall (Extension) and 3212.9m barbed/fence wire (Combined) and perimeter earth road (Average width = 7.2m) Construction of additional culverts and drains for the major dual road “B” at LAUTECH, Iseyin Campus, Length = 800 meters | 1.6 | AB-BOND Con. Ltd. | 28/08/23 | Work completed |
| 15 | Itesiwaju | Extension of 33KVA Power Line, Installation of 1×500 KVA Transformer and Low-Tension Reticulation at Film Village, Igbojaye | Fessy O. General Merch. Co. Ltd | 15/09/23 | Work completed | |
| 16 | Olorunsogo | · Construction of reinforced (2.0m x 1.5m) double cell box culverts, with reinforced retaining wall and RC lined drainage at Amo river (phase I) along Bonni Road; · Construction of reinforced (2.0m x 1.5m) double cell box culverts, with reinforced retaining wall and RC lined drainage at Amo river (phase II) along Bonni Road; Rehabilitation of Igbeti – Bonni Road | 348M | Direct Labour | 12/10/23 | Work completed |
| 17 | Iseyin | Construction and furnishing of proposed Office Building for the College of Agricultural Sciences and Renewable Natural Resources at Ladoke Akintola University of Technology (LAUTECH), Iseyin Campus | AB-Bond Con. Ltd. | 10/01/24 | Ongoing | |
| 18 | Iwajowa | Construction of culvert, drains, earthworks and asphaltic paving of Idiko-Ile to Ayegun road (VARIATION) | SPG Construction | 29/02/24 | Work completed | |
| 19 | Iseyin | Construction of reinforced concrete culvert, R.C. drains, reinforced concrete retaining walls, earthworks and asphaltic concrete paving of Ado-Awaye/Abeokuta Road junction – Psaltry International Limited – Alayide village road (Length = 2.5km, Average Width = 7.5) | 2.5 | AB-BOND | 09/05/24 | Work completed |
| 20 | Iseyin | Construction and furnishing of proposed Office Building for the College of Agricultural Sciences and Renewable Natural Resources at Ladoke Akintola University of Technology (LAUTECH), Iseyin Campus – (Variation) | AB-BOND Habitat Con. Ltd | 01/08/24 | Work completed | |
| 21 | Iseyin/ Ogbomoso Local Government Councils | Installation of Weighbridge Systems on the construction of Iseyin-Apewo village Junction Ahoro-Dada-Fapote-Ogbomoso Road (Lots 1 & 2) | Min. of Works | 01/08/24 | Ongoing | |
| 22 | Atisbo | Construction of double cell reinforced concrete box culvert (3.0m x 3.0m x 7.3m) with approaches of Abisa river, along General Hospital road, Sando area, Ago-Are | AB-BOND Habitat Con. Ltd | 26/11/24 | Work completed | |
| 23 | Atisbo | Construction of double cell reinforced concrete box culvert (3.0m x 3.0m x 7.3m) with approaches at Abata river – Ofiki | AB-BOND Habitat Con. Ltd | 26/11/24 | Work completed | |
| 24 | Iseyin | Construction of Reinforced Concrete Culvert, RC Drains, Earthworks and Asphaltic Concrete Paving of Road that passes through/behind 750 Seaters Lecture Hall-Laboratory-Hammed Raji (SAN) Lecture Hall and the road passing through Public Transport, Car Park, Sport Area and other facilities and Provision of Solar Light at Lautech Iseyin Campus | AB-BOND Habitat Con. Ltd | 26/11/24 | Work completed | |
| 25 | Iwajowa | Reconstruction of collapsed 4.0m x 3.0m single cell box culvert and construction of R.C. retaining wall at Balogun Village along Iganna-Elekokan road | Direct Labour | 13/01/25 | Ongoing | |
| 26 | Iseyin | Limited rehabilitation of Iseyin-Saki Road (83.82 Km) as expansion of scope of works to Lot 1 | Min. of Works | 03/03/25 | Work completed | |
| 27 | Iseyin/ Ogbomoso | Installation of Weighbridge Systems on the construction of Iseyin-Apewo village Junction Ahoro-Dada-Fapote-Ogbomoso Road (Lots 1 & 2) (REVIEW OF PRICES) | Min. of Works | 03/03/25 | One-off | |
| 28 | Iseyin | Proposed construction and furnishing of College Health Centre for the College of Agricultural Sciences and Renewable Natural Resources at Ladoke Akintola University of Technology (LAUTECH), Iseyin Campus | AB-BOND Habitat Con. Ltd | 28/4/2025 | Ongoing | |
| 29 | Iseyin | Roofing of the ongoing construction of a Five Thousand Capacity Multi-Purpose Hall at NYSC Oyo State Permanent Orientation Camp, Iseyin | Min. of Youth & Sport | 28/04/25 | Ongoing | |
| 30 | Itesiwaju | Construction of a Block of Three (3) Classrooms with Headmaster Office and Toilet at L.A Primary School, Oke-Amu | 25/08/25 | Ongoing | ||
| 31 | Atisbo | Proper construction of Kraal and its perimeter fence | 25/08/25 | Ongoing | ||
| 32 | Irepo | Construction of a block of three (3) classrooms with Head Master’s office, store and toilet at Ajangba Community Primary School | Direct Labour | Work completed |
Oyo Zone


| S/N | LOCAL GOVERNMENT AREA | NAME OF PROJECT | NO. OF KM | CONTRACTOR | APPROVED DATE | REMARKS |
| 1 | Oyo East | Reconstruction of the burnt Akesan Market | Mortayus Nig. Ltd. | 2020 | Work completed | |
| 2 | Oyo East | Repair of hydraulic structures and asphaltic overlay of Rt. Hon. Monsurat Sunmonu road, Kosobo | QuickBorn Nig Ltd. | 13/1/23 | Work Competed | |
| 3 | Atiba | Constructions of single cell reinforced concrete box culvert, reinforced concrete retaining wall, laterite backfilling and asphalt overlay of Alaafin High School, Gbodu area; e.t.c. | QuickBorn Nig Ltd. | 22/11/22 | Work completed | |
| 4 | Atiba | · Renovation and upgrading of Basorun of Oyo’s palace · Renovation of burnt and dilapidated police (MTD) building, Ode-Aremo for Amotekun Security Out-fit | Biodel Ventures Ltd. | 16/1/23 | Work completed | |
| 5 | Oyo South East LCDA | Drilling of Two (2) standard industrial boreholes and reticulation | Direct Labour | 10/05/23 | Work completed | |
| 6 | Afijio | Construction of hydraulic and asphaltic pavement of Eleekara/Christian Baptist Conference Road, Abojupa Scheme | 1.3 | AB-BOND Con. Ltd | 15/09/23 | Work completed |
| 7 | Afijio | Construction of Hydraulic and Asphaltic Pavement of Eleekara/Christian Baptist Conference Road, Abojupa Scheme (Phase II) | 890M | AB-Bond Con. Ltd. | 10/01/24 | Work completed |
| 8 | Atiba | Construction of drains, culverts, earthworks and asphaltic pavement of Kosobo road. | AB-BOND Habitat Con. Ltd | 13/01/25 | Work completed | |
| 9 | Oyo West | Asphaltic improvement of some selected roads in Oyo Township | Woodend Limited | 06/03/25 | Work completed | |
| 10 | Atiba | Proposed construction and furnishing of College Health Centre for Emmanuel Alayande University of Education. | AB-BOND Habitat Con. Ltd | 28/4/2025 | Ongoing | |
| 11 | Oyo East Local Government Council | Construction of drains, culverts earthworks and asphaltic pavement of Kosobo road. | Quickborn Nigeria Limited | 17/10/25 | Ongoing |



Pingback: The Construction of Hydraulic Structures and Asphaltic Overlay of Abayomi Holy Trinity Estate, Old Ife Road, Ibadan is Complete | Oyo State Feedback Service