Skip to content

New Update on the Construction of the 110 km Senator Rashidi Ladoja Circular Road

Picture of 110 km Senator Rashidi Ladoja Circular Road (Lagos-Ibadan Expressway) taken on 13th July 2023

An update and pictures of the re-awarded construction of the 110 km Senator Rashidi Ladoja Circular Road, Ibadan. The East End Wing (32 km), one of the phases of the Senator Rashidi Ladoja Circular Road construction project is ongoing. This phase which is being executed by Craneburg Construction Ltd comprises the construction of 6 bridges including 2 interchanges.

The East End Wing of the 110 km Senator Rashidi Ladoja Circular Road was inspected by Governor Seyi Makinde on July 1, 2023. The 110 km Senator Rashidi Ladoja Circular Road will provide a strategic link between different parts of the city of Ibadan and the new Central Business District as it encircles the urban area of the Ibadan Metropolis.

Below is a slideshow of pictures of the construction of bridges and interchanges on the East End Wing (32 km) of the 110 km Senator Rashidi Ladoja Circular Road, Ibadan:

  • Ciruclar roAD DRONE 4
  • DSC09993
  • Picture of 110 km Senator Rashidi Ladoja Circular Road (Lagos-Ibadan Expressway) taken on 13th July 2023
  • Ciruclar roAD DRONE 12
  • DSC09987
  • DSC00016
  • Ciruclar roAD DRONE
  • Ciruclar roAD DRONE LAG IBD EXPRESS 20
  • DSC00020
  • Ciruclar roAD DRONE 10
  • DSC09973
  • Ciruclar roAD DRONE 1
  • DSC00007
  • Ciruclar roAD DRONE LAG IBD EXPRESS 20 2
  • Ciruclar roAD DRONE LAG IBD EXPRESS 13
  • DSC09970

1 thought on “New Update on the Construction of the 110 km Senator Rashidi Ladoja Circular Road”

  1. Pingback: Ongoing Project: 110 km Senator Rashidi Ladoja Circular Road Construction | Oyo State Feedback Service

Leave a Reply