Another update and pictures of the ongoing dualisation of the 7.2 km Idi Ape-Basorun-Akobo-Odogbo Barracks Road, Ibadan. The contract for the completion of this dualisation project was reawarded in November 2020, facilitated by the Oyo State Investment and Public Private Partnership Agency .
Below is a slideshow and pictures of the Idi Ape-Basorun-Akobo-Odogbo Barracks Road dualisation project.

Idi Ape-Basorun-Akobo-Odogbo Barracks Road (1) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (2) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (3) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (4) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (5) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (6) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (7) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (8) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (9) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (10) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (11) 
Idi Ape-Basorun-Akobo-Odogbo Barracks Road (12)



Pingback: Ongoing Project: Dualisation of the Idi Ape-Basorun-Akobo-Odogbo Barracks Road, Ibadan (7.2 km ) | Oyo State Feedback Service
Comments are closed.