An update and pictures of the ongoing reconstruction of the 21 km Airport-Ajia-New Ife Express Road with a spur to Amuloko, Ibadan, which is progressing. Messrs Peculiar Ultimate Concerns Limited is executing the project for the Oyo State Government.
This post focuses on the three-span overhead bridge measuring 50.58 metres in length, which is currently under construction as part of the Airport-Ajia-New Ife Express Road with a spur to Amuloko project. This bridge will enhance connectivity between the Ibadan-Ife Expressway and Ajia, improving transportation access for residents and businesses in the area.
Below is a slideshow of the ongoing reconstruction of the 21 km Airport-Ajia-New Ife Express Road with a spur to Amuloko, Ibadan (The Bridge):

The Bridge connecting Ibadan-Ife Expressway and Ajia (1) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (2) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (3) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (4) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (5) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (6) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (7) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (8) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (9) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (10) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (11) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (12) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (13) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (14) 
The Bridge connecting Ibadan-Ife Expressway and Ajia (15)


