Now Completed: The Oke Adu-Ode Aje-Aremo-Orita Aperin Road (3.5 km) Reconstruction Project

Picture of the completed Oke Adu-Ode Aje-Aremo-Orita Aperin Road (3.5 km) Reconstruction Project taken on 9 July 2024

A final update and pictures of the completed reconstruction of the Oke Adu-Ode Aje-Aremo-Orita Aperin Road (3.5 km). The Oke Adu-Ode Aje-Aremo-Orita Aperin Road is one of two roads under Lot 2 of roads approved for reconstruction by the Oyo State Executive Council on 5 December 2023. The other road, the Bus Stop Gate-Oje-Beere-Oja Oba-Molete Under Bridge Road, is also completed. Both projects were handled by Ratcon Construction Company.

Similar to the Bus Stop Gate-Molete Under Bridge project, the Oke Adu-Ode Aje-Aremo-Orita Aperin Road underwent the following works:

  • Cutting off failed spots and removing unsuitable materials within the potholes
  • Scarification of distressed sections of the road
  • Desilting of drains
  • Construction of 0.6 m x 0.6 m open reinforced concrete lined drain
  • Construction of 1.0 m x 1.0 m open reinforced concrete lined drain
  • Provision of 200-millimetre thick sub-base
  • Provision and placing of 150-millimetre thick crushed stone base
  • Provision of a compacted 40-millimetre asphaltic concrete binder course as a regulating course
  • Provision of a compacted 40-millimetre asphaltic concrete wearing course as an overlay
  • Road marking

The Oke Adu-Ode Aje-Aremo-Orita Aperin Road was part of eight feeder roads in Ibadan totalling 38.48 km commissioned on 11 July 2024 by Governor Seyi Makinde. The road provides a link to several roads and landmarks in the Ibadan North East Local Government Area, such as the Oje-Beere Road, Orita Aperin-Beere Road, Agugu Police Station-Oremeji Bridge Road, O.L.A Catholic Hospital Oluyoro Oke-Ofa, Irefin Palace, and the General Hospital Aremo.

Below is a slideshow of pictures of the completed reconstruction of the Oke Adu-Ode Aje-Aremo-Orita Aperin Road:

  • DSC09661
  • DJI 0829
  • DJI 0839
  • DSC09669
  • DJI 0833
  • DSC09650
  • DSC09671
  • DJI 0836
  • DSC09688
  • DSC09660
  • Picture of the completed Oke Adu-Ode Aje-Aremo-Orita Aperin Road (3.5 km) Reconstruction Project taken on 9 July 2024
  • DSC09646

Leave a Reply