Skip to content

The Completed Asphaltic Rehabilitation of the 1.7 km Molete Under Bridge-Idi Odo-Challenge Road

The Completed Asphaltic Rehabilitation of the 1.7 km Molete Under Bridge-Idi Odo-Challenge Road, taken on 17 March 2026.

A final update and pictures from the completed rehabilitation of the Molete Under Bridge-Idi Odo-Challenge Road in Ibadan South East LGA. All major construction works on the Molete Under Bridge-Idi Odo-Challenge Road, including drainage reconstruction, pavement strengthening, and asphaltic surfacing, have been successfully carried out. The road now has a smooth, durable asphalt surface supported by upgraded drainage infrastructure designed to prevent water accumulation and extend the lifespan of the roadway.

The roads have been marked, which will improve lane discipline, visibility, and overall safety for motorists, pedestrians, and public transport operators.

Residents, commuters, traders, and transport operators along the Molete–Challenge axis now experience improved traffic flow, safer movement, and reduced vehicle wear as a result of the completed works. Road users are advised to continue exercising caution and comply with traffic guidance on the road.

Updates on projects across the State remain available on the official Oyo State Government Feedback Service social media platforms.

Below are pictures from the almost done Molete Under Bridge-Idi Odo-Challenge Road:

Leave a Reply